MHAM Technologies logo
MHAM TECHNOLOGIES S.R.L.
ASSEMBLY · INSTALLATION · COMMISSIONING
WORKS CONTRACTS · MEP · PLANT · SHIPBUILDING

Ventilation, insulation, industrial assembly. Delivered as a complete work package.

MHAM Technologies delivers installation packages under works contracts and on its own responsibility: experienced crews, German-speaking site management on site, one contracting partner through to acceptance.

Request a quote Call +49 171 5179151
Ventilation plant room with ducts, pipework and air handling units
Works contract, not labour leasing
We owe the result, not the hour.
A1 for every assignment
Posting documentation before work starts.
Reverse-charge invoicing
Under § 13b UStG.
WHO WE WORK FOR

Two worlds, one standard of workmanship.

BUILDING SERVICES

MEP and ventilation contractors

You have the contract but not the capacity. We take on clearly defined installation sections and hand them over ready for acceptance.

Request a quote for a section →
SHIPBUILDING · MARINE · PLANT ENGINEERING

Shipyards and plant builders

Tight spaces, fixed schedules, documentation-heavy work. Our site management knows shipyard routine from first-hand project experience.

Request supplier documents →
SERVICES

Work packages we take on in full.

Round duct with bend and suspensionInsulated pipework
01
Ventilation and ductwork
Ducts, units, air-conditioning components through to leak testing.
02
Technical insulation
Thermal, cold and fire-protection insulation on ducts, pipes and vessels.
03
Industrial assembly and commissioning
Positioning and installation of machinery and plant.
04
Metalwork and steel fabrication
Brackets, substructures, steelwork at the plant.
05
Drywall (in development)
Our own teams, coordinated with the MEP trades.
06
Component supply
Duct sections and fittings, with installation or separately.
HOW WE WORK

From enquiry to acceptance in five steps.

1
Enquiry and documents
Bill of quantities, drawings, time frame. Response within 2 working days.
2
Costing and quotation
Unit prices or lump sum, clearly defined scope of work.
3
Mobilisation
We organise A1 certificates, safety briefings, accommodation, tools and travel.
4
Execution
Our own site management runs the crew and reports to you in German or English.
5
Acceptance and documentation
Measurement, records and invoice from a single source.
QUALITY AND COMPLIANCE

Verifiable, not just promised.

ISO 9001:2015
Certification commissioned, audit in early 2027.
Works contracts
Defined result, own direction of work, own warranty.
A1 certificates
For every worker before work starts.
SAP Ariba
Registered as a supplier on the network.
REFERENCES

Our two most recent contracts.

For confidentiality reasons we do not name clients and building owners publicly.

Ventilation plant room with units, ducts and pipework

Ventilation and plant room, new build

SCOPE
Ventilation duct, fittings, insulation
LOCATION
Braunschweig
TEAM
4 fitters
Insulated ventilation duct on an outdoor-installed system

Outdoor-installed ventilation system

SCOPE
Spiral duct, exhaust stack, insulation, stainless-steel pipework
LOCATION
Freiburg
TEAM
4 fitters
YOUR CONTACT
Dierk Andresen, Managing Director

Dierk Andresen

Managing Director and Site Manager

State-certified engineer (process engineering), more than 25 years of site management and commissioning in plant engineering, building services and shipbuilding. Certified safety specialist, assignments in Germany, China and Pakistan. Prices your project himself and remains your contact through to acceptance.

CAREER
Dürr (Audi, Kia Pakistan) · Reicofil (China) · KAEFER (Wismar shipyard) · Obermeyer (RAG Ibbenbüren) · DESY Hamburg
Cristina Gümürcü, Office Manager
OFFICE
Cristina Gümürcü
Contracts, A1, purchasing documents, QM. German, English, Romanian, Turkish.
+40 745 409 972
MHAM Technologies S.R.L. – Mechanical, Hydraulics, Assembly, Manufacturing
CONTACT

Let's discuss your project.

We use your details solely to handle your enquiry. Details in the Privacy Policy.
Direct: Dierk Andresen
+49 171 5179151dierk.andresen@mham-technologie.com
Office
+40 745 409 972cristina.gumurcu@mham-technologie.com
MHAM TECHNOLOGIES S.R.L.
Bulevardul Felix Nr. 86, Office 4, 417495 Sânmartin, Bihor, Romania
CUI RO49258593 · Reg. J2023003109059
Managing Director: Dierk Andresen · VAT ID RO49258593
Legal notice Privacy Cookies
Call Request a quote
MHAM TECHNOLOGIES S.R.L. · SÂNMARTIN, BIHOR · CUI RO49258593
+49 171 5179151 dierk.andresen@mham-technologie.com
MHAM Technologies logo
MHAM TECHNOLOGIES S.R.L.
ASSEMBLY · INSTALLATION · COMMISSIONING
Services Sectors How we work Quality References
DE · EN · RO
Request a quote
WORKS CONTRACTS · BUILDING SERVICES · PLANT ENGINEERING · SHIPBUILDING

Ventilation, insulation, industrial assembly. Delivered as a complete work package.

MHAM Technologies delivers installation packages under works contracts and on its own responsibility: experienced crews, German-speaking site management on site, one contracting partner from cost estimate to final acceptance.

Request a quote +49 171 5179151
Ventilation plant room with ducts, pipework and air handling units
Works contract, not labour leasing
We owe the result, not the hour.
A1 for every assignment
Complete posting documentation before work starts.
Reverse-charge invoicing
Under § 13b UStG, clean for your accounting.
Round duct with bend and suspension below the ceiling
VENTILATION DUCT · FITTINGS · SUSPENSION
Insulated pipework with sheet-metal cladding and rubber insulation
THERMAL AND COLD INSULATION
Exhaust stack made of spiral duct with galvanised support structure
EXHAUST STACK · SUPPORT STRUCTURE
WHO WE WORK FOR

Two worlds, one standard of workmanship.

BUILDING SERVICES

MEP and ventilation contractors

You have the contract but not the capacity. We take on clearly defined installation sections as a subcontractor and hand them over ready for acceptance.

Duct and pipe installation in industrial buildings, hospitals and data centres
Fixed crews for construction phases lasting several months
Billing by measurement or lump sum
Request a quote for a section →
SHIPBUILDING · MARINE · PLANT ENGINEERING

Shipyards and plant builders

Tight spaces, fixed schedules, documentation-heavy work. Our site management knows shipyard routine from first-hand project experience.

On-board ventilation and air-conditioning systems, insulation, outfitting installation
Registered supplier on SAP Ariba
ISO 9001:2015: certification commissioned, audit in early 2027
Request supplier documents →
SERVICES

Work packages we take on in full.

01

Ventilation and ductwork

Installation of ducts, fittings, units and air-conditioning components, from shell construction to leak testing.

02

Technical insulation

Thermal, cold and fire-protection insulation on ducts, pipework and vessels by specialised insulators.

03

Industrial assembly and commissioning

Positioning and installation of machinery and plant, supported through to commissioning.

04

Metalwork and steel fabrication

Brackets, substructures and steelwork around the plant.

05
IN DEVELOPMENT

Drywall

New service line with our own drywall teams, coordinated with the MEP trades.

06

Component supply

Duct sections, fittings and air-conditioning components, together with installation or separately.

HOW WE WORK

From enquiry to acceptance in five steps.

1
Enquiry and documents
Bill of quantities, drawings, time frame. Response within 2 working days.
2
Costing and quotation
Unit prices or lump sum, clearly defined scope of work.
3
Mobilisation
We organise A1 certificates, safety briefings, accommodation, tools and travel.
4
Execution
Our own site management runs the crew and reports to you in German or English.
5
Acceptance and documentation
Measurement, records and invoice from a single source.
QUALITY AND COMPLIANCE

Verifiable, not just promised.

Everything your purchasing and legal departments want to see before placing an order is available from us.

ISO 9001:2015
QM system in place, certification commissioned. Audit in early 2027.
Works contracts
Project-based, with a defined result, our own direction of work and our own warranty.
A1 certificates
For every worker deployed, available on site before work starts.
SAP Ariba
Registered as a supplier on the Ariba Network, ready for corporate procurement processes.
German-speaking site management
Coordination in German, English, Romanian, Polish and Slovak.
Occupational safety
Led by a certified safety specialist. Safety briefing for every crew before work starts.
REFERENCES

Our two most recent contracts.

For confidentiality reasons we do not name clients and building owners publicly.

Ventilation plant room with units, ducts and pipework

Ventilation and plant room, new build

SCOPE
Ventilation duct, fittings, insulation
LOCATION
Braunschweig
TEAM
4 fitters
Insulated ventilation duct on an outdoor-installed system

Outdoor-installed ventilation system

SCOPE
Spiral duct, exhaust stack, insulation, stainless-steel pipework
LOCATION
Freiburg
TEAM
4 fitters
Dierk Andresen, Managing Director
YOUR CONTACT

Dierk Andresen, Managing Director

State-certified engineer (process engineering) with more than 25 years in site management, construction supervision and commissioning of industrial plants and building services. He prices your project himself and remains your direct contact through to acceptance.

Certified safety specialist
Expert assessor for plants and machinery
Projects in automotive, plant engineering and shipbuilding
Assignments in Germany, China and Pakistan
Fluent in English and Dutch
QM experience to ISO 9001
CAREER
Dürr (Audi Ingolstadt, Kia Pakistan) · Reicofil (China) · KAEFER (Wismar shipyard) · Obermeyer (RAG Ibbenbüren) · Lethe Yacht Galleys · DESY Hamburg
Cristina Gümürcü, Office Manager
OFFICE

Cristina Gümürcü, Office Manager

Contracts, A1 certificates, documents for your purchasing department and quality management. You can reach Cristina in German, English, Romanian and Turkish.

MHAM Technologies S.R.L. – Mechanical, Hydraulics, Assembly, Manufacturing
CONTACT

Let's discuss your project.

Send us your bill of quantities or key data. You will get an honest assessment of whether and when we can take on the work.

Company
MHAM Technologies S.R.L.
Registered office
Sânmartin, Bihor, Romania
Contact person
Dierk Andresen, Managing Director
Telefon
+49 171 5179151
Direct e-mail
dierk.andresen@mham-technologie.com
Office
cristina.gumurcu@mham-technologie.com
Office phone
+40 745 409 972
We use your details solely to handle your enquiry. Details in the Privacy Policy.
MHAM TECHNOLOGIES S.R.L.
Mechanical · Hydraulics · Assembly · Manufacturing
Bulevardul Felix Nr. 86, Office 4, 417495 Sânmartin, Bihor, Romania
CUI RO49258593 · Reg. J2023003109059
Managing Director: Dierk Andresen · VAT ID RO49258593
+49 171 5179151 · dierk.andresen@mham-technologie.com
Legal notice Privacy Cookies Contact